Joint-Venture with Atlas Asphalt
Delta South performed a Joint-Venture project with Atlas Asphalt from Jonesboro, Arkansas. This $58M project widened Highway 412 from a two-lane highway to a five-lane multi-highway, plus the addition of a new construction bypass in Light, Arkansas. This project included 282,000 tons of asphalt, 331,000 tons of base course aggregates, 460,00 cubic yards of excavation, 811,000 cubic yards of compacted embankment, and 13 box culvert replacements.