Our Projects

US Highway 280 Widening

The Georgia Department of Transportation’s Crisp County US Highway 280 Widening Project consisted of converting 4 miles of existing three-lane roadway and 3.7 miles of existing two-lane roadway all into 7.7 miles of a four-lane highway. Located in the center of our West Region, the project began at the State Route 300 Connector and extended west to the Lake Blackshear bridge. With a value of $25M, major items of work were traffic control, erosion control, clearing, grading, storm drainage, culvert work, bridge widening, aggregate base course, and asphalt paving.

We are ready to partner with you

and develop a strong, long-lasting relationship.